메뉴 건너뛰기
.. 내서재 .. 알림
소속 기관/학교 인증
인증하면 논문, 학술자료 등을  무료로 열람할 수 있어요.
한국대학교, 누리자동차, 시립도서관 등 나의 기관을 확인해보세요
(국내 대학 90% 이상 구독 중)
로그인 회원가입 고객센터 ENG
주제분류

추천
검색
질문

논문 기본 정보

자료유형
학술저널
저자정보
김은주 김진희 (부산대학교) 허영기 (부산대학교)
저널정보
대한건축학회 대한건축학회 논문집 - 구조계 大韓建築學會論文集 構造系 第32卷 第12號 (通卷 第338號)
발행연도
2016.12
수록면
69 - 75 (7page)

이용수

표지
📌
연구주제
📖
연구배경
🔬
연구방법
🏆
연구결과
AI에게 요청하기
추천
검색
질문

초록· 키워드

오류제보하기
Understanding how BIM is being used in a real construction is the most important in order to facilitate the practical uses of BIM in construction projects, which can lead to improvement of site work efficiency. Primarily BIM works in construction phase were classified into eleven sub-tasks, and quantitative analysis were conducted with BIM data files and BIM daily work reports from a building project that the researcher was personally involved. The analysis revealed that the total number of tasks using BIM in the project was 244 cases and actual work hours were about 3,260. From a detailed analysis with seven sub-tasks only corresponding to the group of ‘direct support’ task, it was also found that tasks related to ‘design change’ were the most with 53.8 percent and ‘constructability review’ with 17.6 percent and ‘Shop drawing’ with 15.5 percent were followed. On the other hand, tasks associated with ‘modification of modeling’ were few with 0.8 percent. Furthermore, an unnecessary BIM works caused by ‘avoidable design change’, namely ‘design error’, ‘omission of drawing’, and ‘rework’, was approximately 14 percent. The quantitative analyses results found from this study will serve a good foundation for facilitating the uses of BIM in building construction project and eventually improving on-site work efficiency.

목차

Abstract
1. 서론
2. 문헌연구고찰
3. 사례사업의 개요와 BIM을 활용한 수행업무
4. 분석기준 및 분석방법
5. ‘시공지원업무’ 분석
6. 결론
REFERENCES

참고문헌 (11)

참고문헌 신청

함께 읽어보면 좋을 논문

논문 유사도에 따라 DBpia 가 추천하는 논문입니다. 함께 보면 좋을 연관 논문을 확인해보세요!

이 논문의 저자 정보

이 논문과 함께 이용한 논문

최근 본 자료

전체보기

댓글(0)

0

UCI(KEPA) : I410-ECN-0101-2017-540-002054859